Editing User:Wouter.drucker/Notes
Warning: You are not logged in.
Your IP address will be recorded in this page's edit history.The edit can be undone.
Please check the comparison below to verify that this is what you want to do, and then save the changes below to finish undoing the edit.
Latest revision | Your text | ||
Line 1: | Line 1: | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
== Outdoor sports == | == Outdoor sports == | ||
Line 245: | Line 229: | ||
+ Low maintenance cost. | + Low maintenance cost. | ||
− | |||
− | |||
+ Uses greenhouses that can be used for agriculture. | + Uses greenhouses that can be used for agriculture. | ||
Line 434: | Line 416: | ||
== Notes solar updraft tower cost == | == Notes solar updraft tower cost == | ||
− | Plant China 200 mil USD = 27,5 MW | + | Plant China 200 mil USD = 27,5 MW |
− | + | ||
− | + | ||
− | + | http://educypedia.karadimov.info/library/Solar%20Updraft%20Towers.pdf | |
− | + | = 342 mil USD = 30 MW | |
Estimates of total costs range from 7 (for a 200 MW plant) and 21 (for a 5 MW plant) euro cents per kWh to 25-35 cents per kWh.<ref> http://physicaplus.org.il/zope/home/en/1124811264/1137833043_en </ref> | Estimates of total costs range from 7 (for a 200 MW plant) and 21 (for a 5 MW plant) euro cents per kWh to 25-35 cents per kWh.<ref> http://physicaplus.org.il/zope/home/en/1124811264/1137833043_en </ref> |